Cómo instalar paneles de azulejo con adhesivos para la construcción - Consejos para la decoración y pintura del hogar

Cómo instalar paneles de azulejo con adhesivos para la construcción

Tileboard and decorative panels (paneling) are for more than just bathrooms. With a wide variety of designs and patterns available, homeowners are choosing accents to transform rooms throughout their homes.
 
Los paneles decorativos y paneles de azulejos pueden destacar un espacio en su casa, y se pueden instalar fácilmente con adhesivo para la construcción. To get the job done, we recommend using LIQUID NAILS® Heavy Duty Construction Adhesive (LN-903).
 

Decorative Panel Installation:

Paso 1.

Make sure the walls are clean, dry and free of loose paint*, plaster or other materials.

Paso 2.

Lightly sand* any glossy-painted walls or ceramic tile, then wipe them clean with a damp rag.

*WARNING! If you scrape, sand or remove old paint, you may release lead dust. LEAD IS TOXIC. Contact the National Lead Information Hotline at 1-800-424-LEAD, or log on to www.epa.gov/lead.

Paso 3.

Apply a 1/4-inch continuous line (bead) of Liquid Nails Heavy Duty Construction Adhesive every 10 to 12 inches across the back of the panel. Keep about one inch from the edges.

Paso 4.

Coloque el panel en su lugar y presiónelo, e inmediatamente vuelva a despegarlo de la pared.

Step 5

After 1 to 3 minutes, press the panel back into place, and secure with desired fasteners as needed.

Tileboard Installation:

Paso 1.

Make sure the walls are clean, dry and free of loose paint*, plaster or other materials.

Paso 2.

Lightly sand* any glossy-painted walls or ceramic tile, then wipe them clean with a damp rag.
 
*WARNING! If you scrape, sand or remove old paint, you may release lead dust. LEAD IS TOXIC. Contact the National Lead Information Hotline at 1-800-424-LEAD, or log on to www.epa.gov/lead.

Paso 3.

Apply Liquid Nails Heavy Duty Construction Adhesive (Trowel Grade) over the entire back of the panel. Con una paleta dentada de 1/8", extienda el adhesivo para pared hacia los bordes y esquinas del panel.

Paso 4.

Wait about five minutes (no more than 15) and then press the panel into place using a panel roller so that good contact is made between the construction adhesive and the wall.

Paso 5.

Revise y vuelva a presionar cada uno de los paneles, especialmente en los bordes, cada 15 minutos durante la primera hora.

Paso 6.

Allow the construction adhesive to dry for 24 to 48 hours.
 
Notes:

For bathrooms, caulk every seam with 100% pure silicone sealant. We recommend using LIQUID NAILS® Silicone Premium Universal Sealant (LS-205). Do not use a siliconized acrylic latex caulk. También coloque sellador alrededor de todos los accesorios. If moldings are used, apply a 1/4-inch continuous line of sealant inside the molding channel and fit the molding onto the panel.

Ceiling Panels Installation:

Paso 1.

Antes de la instalación, asegúrese de que el cielorrasoexistente se encuentre estructuralmente en buen estado y que esté limpio y seco. El yeso, cemento o argamasa deben estar completamente curados antes de aplicar el adhesivo para pared.

Paso 2.

Apply 1/4-inch continuous lines (bead) of adhesive every 3 to 4 inches across the back of your panel. This will ensure at least 60 percent of the back of each panel is covered. Press and hold each panel in place for 5 to 10 seconds and then let go.

Paso 3.

Secure panels as directed using recommended fasteners.
 
Consulte la etiqueta del producto, la hoja de datos técnicos (TDS) o la hoja de datos de seguridad (SDS) para ver las instrucciones detalladas de aplicación y seguridad.